LabelOn Modular Manuals
Read More23 / 29
002 Overhead Conveyor Wind Up
When refitting after shipping there's two steps.
Fasten the overhead wind up assembly with the 4 Bolts
Refit the Overhead Conveyor
Using squaring blocks or same height bottles at each end of the overhead conveyor wind the overhead to touch both bottles lossening the 4 bolts to allow for the leveling and locking in of the overhead position with the four fatening bolts.
- No Comments